PROJECT OVERVIEW
The back of the tubes were separated from the hull, we glued the tube back onto the hull again. Then cleaned the tubes and treated with a new layer of PVC paint in the color red.
It now looks as it is a totally different RIB in bright red.
CUSTOMER:
Private
LENGTH OF THE PROJECT
1 day
WORK
Repair and tube covered with special PVC paint
LOCATION
Ibiza